Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Learn how to do Multiple batch-splitting split data into multiple batches automatically in Taskmonk

  1. Click on Projects at the top of the page

    image-20240627-050342.png

  2. Click on Manage Datasets button under Manage

...

  1. Click on Import under Task(Import/export)

    Screenshot from 2024-06-26 10-59-14.png
  2. Enable multiple batch splits to divide the task into various batches.

    Screenshot from 2024-06-26 11-31-48.png

    You can see set the following batch details

    1. Batch Name

    2. Batch Limit

  1. Editing the batch name is optional , and the batch limit is the maximum number of tasks a batch can haveshould contain

    image-20240626-062022.png

    7. Add batch limit to split the tasks

...

  1. Choose the

...

  1. input file to import the tasks

...

  1. and click on Import

...

8. If the user imports 100 1000 tasks from a file with a batch limit of 30300, then the first batch will have 30 tasks, the second batch will also have 30 tasks, but the two batches will contain 300 tasks and the third batch will have 40 contain 400 tasks.

...

9. If the existing batch name is provided as "Split", " then the first batch name will become be named "Split_1_30300," the second batch will become be "Split_31301_60600," and the third batch will become be "Split_61601_1001000." These names will be generated from the backendautomatically.

Managing Project Datasets

...