Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Project Settings

Use these project Settings fields to specify configurations at the project level.

Image Removedimage-20240320-052256.pngImage Added

Field

Description

Example

Skip Task

Click to specify whether skip task functionality should be Enabled or Disabled.

NA

Allowed Skip-task Count

Enter the number of times a labeler can skip a task in a skipped-tasks queue. Once this number is reached, the labeler must complete at least one task in the skipped queue to be able to skip any additional tasks.

5

Auto Unlock (Duration)

Field

Description

Example

Multi-vendor Project

Click to specify whether you want to use multiple vendors for this project.

NA

Enable QC Notification

Click to specify whether you want labeling analysts to receive mail notifications whenever QA personnel make any changes to tasks on which they had worked. This can serve as a useful feedback loop.

True

Notification Emails

Enter email IDs to which notifications must be sent. This field is enabled only if the value in the Enable QC Notification field is True.

john.doe@examplecompany.com

Golden-task Percentage (%)

Click to select the percentage of pre-labeled data that must be included into a batch for labeling. This helps you match the labels created by labelers with the expected labels and evaluate the labelers' performance.

10%

Clarification Flow

Click to specify whether you want to enable a clarification flow, so labelers can ask questions as comments to labels and request guidance from QA team members.

True

Task Submission Controls

Use these fields to create task-submission-related configurations.

Image Removed

Name/url of media

Click to specify whether you want to

enable the Auto Unlock feature. If this feature is enabled, a locked task will automatically get unlocked after a specific number of minutes.

Enabled

Time (in mins)

Enter the number of minutes after which a locked task will be automatically unlocked and reassigned.

60

Allow After (in secs)

Enter the number of seconds after which the Skip button must be enabled when a new task appears in the labeling UI.

20

Copy Fields to Next

Set this field to Trueto copy values for all fields from current task to the next task as defaults. These values can be edited as required.

NA

Confirmation Popup

Click to specify whether a confirmation popup should appear upon successful task submission.

Available Options:

  • Yes

  • No

NA

Confirmation Message

Enter the confirmation that you want to display in the confirmation popup, if the value in the Confirmation Popup field is Yes.

Congrats! Your updates have been submitted successfully!

Field configuration (Based on field type)

Remove extra space from text field value : Click to Remove Extra space from text field value.

NA

Hide a Name/URL, by default it is Unhide.

NA

Task Submission Controls

Use these fields to create task-submission-related configurations.

Image Added

Annotation & Segmentation Settings

Use annotation settings to control how annotators use the labeling labelling UI, how the labeling labelling UI handles specific types of input, and whether majority logic is interpreted in the back-endbackend. These configuration options available in this section change depending on the Project Type.

...